House installation

Factory building kit assembly takes 2 – 3 days (depending on the project). Heavy machinery crane is used to setup the building blocks of the house right in front of your eyes. Assembly process is carried out by trained personnel who under the supervision of the engineer install the main constructions of the building. After the bearing walls have been installed, finishing of the roof and interior can be started.